Mold design office
Our designers turn your need into a mold that works the first time: a drawing, a file, a sample or an idea is enough to start.

What you can send us
A 3D file
.step .iges .stl
STEP, IGES or STL: we import it straight into SolidWorks.
A 2D drawing
.dwg .pdf
DWG or dimensioned PDF: we model the part and have you approve it.
A sample
An existing part to copy or improve: we measure it and rebuild it in 3D.
An idea
A sketch or a description: we design the part with you, then the mold.
From drawing to part
One workshop from the first conversation to delivery, with one point of contact at every step.
01
Specification
A drawing, a 3D file, a sample or just an idea: together we set the material, the number of cavities and the annual volume.
02
CAD design
Our design office designs the mold in SolidWorks and AutoCAD: parting line, slides, ejection, cooling.
03
Machining
Mastercam programming, machining on our Hartford CNC centers and EDM for fine details.
04
Fitting and polishing
Our toolmakers fit, assemble and mirror-polish the cavities.
T0
Free T0 trial
First parts molded on our 180-ton press and presented for your approval.
06
Delivery
Once approved, the mold is delivered ready for production.
A part designed to be molded
Before designing the mold, we check with you that the part molds well: draft angles, wall thickness, gate locations, parting line, undercuts. Fixing a detail on the drawing always costs less than modifying a mold.
Our tools
| SolidWorks | 3D design of parts and molds |
|---|---|
| AutoCAD | 2D drawings and drafting |
| Mastercam | CAM programming for CNC machining |

Questions about design
I only have an idea, not a drawing. Can you help?
Yes. Our design office designs the part with you, then the mold. You approve every step.
Which file formats do you accept?
STEP, IGES, STL, DWG, PDF and photos. The form takes 4 MB in total; for larger files, use WhatsApp or contact@simfrikha.com.
How long does the design take?
Design is part of the overall lead time: for a mold of typical complexity, allow 4 to 6 weeks from order to the T0 trial.